Index of Pictures

  01/01 - The temporary kitchen, with salvaged counter 01/01 - More temporary kitchen 01/01 - The new window is in, and the back door is framed 01/01 - Framing the new kitchen window. 01/01 - Framing the new skylight well  
  01/01 - The temporary kitchen, with salvaged counter 01/01 - More temporary kitchen 01/01 - The new window is in, and the back door is framed 01/01 - Framing the new kitchen window. 01/01 - Framing the new skylight well

  01/07 - New kitchen windows installed 01/07 - Kitchen windows from the outside 01/07 - Bathroom nook demoed out 01/09 - The correct pocket door frame 01/09 - Corrected skylight well framing  
  01/07 - New kitchen windows installed 01/07 - Kitchen windows from the outside 01/07 - Bathroom nook demoed out 01/09 - The correct pocket door frame 01/09 - Corrected skylight well framing

  01/09 - Back window outside view 01/15 - The flooring has arrived to acclimate 01/15 - The skylight well, fully framed in 01/15 - Electrical in the bar area 01/18 - Lighting, electrical & plumbing in the kitchen  
  01/09 - Back window outside view 01/15 - The flooring has arrived to acclimate 01/15 - The skylight well, fully framed in 01/15 - Electrical in the bar area 01/18 - Lighting, electrical & plumbing in the kitchen

  01/18 - Kitchen & pony-wall electrical 01/18 - Electrical over island 01/18 - Looking at the 01/18 - Kitchen plumbing & electrical 01/18 - The zip-door has been replaced with a temporary door  
  01/18 - Kitchen & pony-wall electrical 01/18 - Electrical over island 01/18 - Looking at the "island" 01/18 - Kitchen plumbing & electrical 01/18 - The zip-door has been replaced with a temporary door

  01/25 - During our remodel, the city came through and repaved the sidewalk 01/25 - Siding around the new kitchen windows 01/25 - The applicances have been gathered under a tarp 01/25 - The temporary wall in the laundry closet, for bathroom privacy 01/25 - The plumbing in the laundry closet, and the new wall  
  01/25 - During our remodel, the city came through and repaved the sidewalk 01/25 - Siding around the new kitchen windows 01/25 - The applicances have been gathered under a tarp 01/25 - The temporary wall in the laundry closet, for bathroom privacy 01/25 - The plumbing in the laundry closet, and the new wall

  01/25 - Three drain vents (laundry, shower, steam-oven) combined into one 01/25 - The monolithic cold-air return, in the wrong place 01/25 - The form for the alcove 01/25 - Ethernet wiring installed 01/28 - Cold air return moved to alcove ceiling  
  01/25 - Three drain vents (laundry, shower, steam-oven) combined into one 01/25 - The monolithic cold-air return, in the wrong place 01/25 - The form for the alcove 01/25 - Ethernet wiring installed 01/28 - Cold air return moved to alcove ceiling

  01/28 - Knee-boards in the attic 01/28 - The snazzy new mail slot 01/28 - Duct for the range hood 01/28 - Plumbing for the steam oven, and the toekick heater vent 01/28 - Seismic bracing on the back wall  
  01/28 - Knee-boards in the attic 01/28 - The snazzy new mail slot 01/28 - Duct for the range hood 01/28 - Plumbing for the steam oven, and the toekick heater vent 01/28 - Seismic bracing on the back wall

  01/28 - More seismic bracing 01/29 - Insulation in the kitchen 01/29 - And the living room 01/29 - They had extra insulation, so they did the coat closet and the bar wall  
  01/28 - More seismic bracing 01/29 - Insulation in the kitchen 01/29 - And the living room 01/29 - They had extra insulation, so they did the coat closet and the bar wall

created with igal