Index of Pictures

  02/02 - Rockin' the house! 02/02 - It's starting to look like a real room 02/02 - The kitchen has walls 02/02 - And so does the bar 02/02 - Look at the subtle bend in that sheetrock...  
  02/02 - Rockin' the house! 02/02 - It's starting to look like a real room 02/02 - The kitchen has walls 02/02 - And so does the bar 02/02 - Look at the subtle bend in that sheetrock...

  02/05 - The mud-and-tape guys start working 02/05 - Paul (lead carpenter), Kai (production manager), JoAnne (Designer) 02/05 - The snazzy cherry frame for the back door 02/13 - The mud-and-tape guys worked miracles on the skylight 02/13 - The alcove after mud-and-tape, with the crown molding  
  02/05 - The mud-and-tape guys start working 02/05 - Paul (lead carpenter), Kai (production manager), JoAnne (Designer) 02/05 - The snazzy cherry frame for the back door 02/13 - The mud-and-tape guys worked miracles on the skylight 02/13 - The alcove after mud-and-tape, with the crown molding

  02/13 - Casing around the dining room windows 02/13 - The first day's worth of red birch flooring 02/16 - Layers of thin plywood to shim out a depression in the subfloor 02/16 - The wood heat registers 02/17 - Crown molding in the bar area  
  02/13 - Casing around the dining room windows 02/13 - The first day's worth of red birch flooring 02/16 - Layers of thin plywood to shim out a depression in the subfloor 02/16 - The wood heat registers 02/17 - Crown molding in the bar area

  02/17 - The floor marches on 02/19 - Filler on the completed floor 02/19 - The cabinets have finally arrived! 02/21 - Unpacking the cabinets 02/21 - Installing the first cabinets  
  02/17 - The floor marches on 02/19 - Filler on the completed floor 02/19 - The cabinets have finally arrived! 02/21 - Unpacking the cabinets 02/21 - Installing the first cabinets

  02/23 - The island and bar cabinets are in 02/24 - Drawers and doors and wall cabinets 02/24 - The upper cabinets in the bar 02/24 - The cherry frame on the back door 02/24 - Trim on the interior doorframes  
  02/23 - The island and bar cabinets are in 02/24 - Drawers and doors and wall cabinets 02/24 - The upper cabinets in the bar 02/24 - The cherry frame on the back door 02/24 - Trim on the interior doorframes

  02/25 - Starting on the baseboards 02/25 - The builtin cabinetry 02/25 - The lights in the bar cabinets 02/27 - The pantry cabinets 02/27 - Building the bookshelf  
  02/25 - Starting on the baseboards 02/25 - The builtin cabinetry 02/25 - The lights in the bar cabinets 02/27 - The pantry cabinets 02/27 - Building the bookshelf

  02/27 - Stucco is done on the rear wall 02/27 - Stub plumbing for a possible future water softener 03/01 - The pocket door in the coat closet 03/01 - Paint samples all over the walls 03/01 - The bookshelf in its place  
  02/27 - Stucco is done on the rear wall 02/27 - Stub plumbing for a possible future water softener 03/01 - The pocket door in the coat closet 03/01 - Paint samples all over the walls 03/01 - The bookshelf in its place

created with igal